Deck General USCG Question #4147 (Set 132)

While the DEEP DRILLER is loaded as shown in Sample Form #4 (Drilling), casing is accidentally dropped on the starboard side. Because the sounding level and starboard aft inclination are slowly increasing, you decide that tank 10S has minor damage. Among the possible corrective actions is __________.

Official USCG Answer & Rule Citation

Correct Answer: Option D — place a wooden plug into the vent of tank 10S

Plugging the tank vent prevents progressive downflooding and maintains air cushion control when minor damage is suspected, isolating the tank while stability assessments are conducted per standard damage control procedures.

100% Free & Open Access — No daily limits, paywalls, or gated answers on BrightMariner.