Which of the indicator diagrams illustrated indicates the condition that should be corrected by retarding the timing, and the fitting of thicker shims to the connecting rod? Illustration MO-0029

USCG Exam Illustration MO-0029
USCG Examination Diagram: Illustration MO-0029
Official USCG Answer & Rule Citation

Correct Answer: Option D — D

Indicator diagram 'D' exhibits high peak pressures requiring both injection timing retardation and increased clearance volume, achieved by installing thicker connecting rod shims to lower compression pressures.