Deck General USCG Q#4623 (Set 148)

The DEEP DRILLER suffers minor flooding of the port pump room while in transit. If both port bilge pumps fail to dewater the pump room, you may __________.

Official USCG Answer & Rule Citation

Correct Answer: Option A — use port drill water pump

Emergency dewatering procedures for the port pump room on the DEEP DRILLER authorize utilizing the port drill water pump via designated cross-connections if both primary port bilge pumps become inoperable during transit.