GASCO Exit Exam • Set 14 Question 18 of 30

Onboard an LNG carrier, during loading operations, why should be- ballasting be done concurrently with loading?

✓

Direct Answer

Option B: to keep the vessel within the required limit of draft, trim, stress and stabilty

The correct answer is to keep the vessel within the required limit of draft, trim, stress and stabilty. This complies with established gas tanker operational standards, thermodynamics, and the IGC Code safety requirements.

All Options

A
to reduce vessel turnaround tim
B
to keep the vessel within the required limit of draft, trim, stress and stabilty (Correct Answer)
C
to ensure that the gangway is safe for use at all times
D
deballasting can be done after 50% loading is complet

Detailed Explanation & Context

The correct answer is to keep the vessel within the required limit of draft, trim, stress and stabilty. This complies with established gas tanker operational standards, thermodynamics, and the IGC Code safety requirements.

Relevant Framework: STCW 2010 Manila Amendments • DG Shipping E-Learning & Exit Exam Standards • Advanced Training for Liquefied Gas Tanker Cargo Operations (GASCO).

Advertisement

Practice Full GASCO Set 14

Test yourself with 30 interactive questions, live timer, and instant score.

Launch Practice Simulator →

Question Discussion & Notes

0

Have a doubt, memory trick, or exam update? Share your insights with fellow mariners.

Leave a Comment / Clarification

By posting, you agree to our Terms & Moderation Policy.

Loading mariner discussions...