Question 24 of 30

When you have completed bunkering operations, the hoses should be ___________ .

A
blown down with inert gas
B
drained into drip pans or tanks
C
stowed with their ends open for venting
D
steam cleaned and flushed with hot water
Advertisement

Answer & Explanation

The correct answer is Option B: drained into drip pans or tanks.

After bunkering, hoses must be drained to prevent spillage from residual oil remaining in the line. Draining into drip trays or designated slop tanks ensures that the residual oil is contained and managed correctly.